29 Apr Columbus New Crew Stadium Installs SubAir System
Posted at 11:00h
in Press
“New Crew Stadium’s SubAir system allows the pitch to recover faster from adverse weather conditions. It contains 10.66 miles of red PEX piping below the surface for heating, increasing the temperature of the pitch root zone by up to 28 degrees. Further, the SubAir system can drain water from the pitch in three minutes as compared to gravity systems that can require up to 60 minutes.”